Archive for September 14th, 2009

Top on, no stopping us now

There is such a big difference between how long building could take and does, work, faimily stuff just gets in the way……..
At long last we are back into it, the top deck has been prepaired and is now stitched in place, m3 zip ties rule!!!!!
I am undecided, I dont think we should take the top [...]

More »

Stitched with cable ties

This is the Kayak only held together with cable ties we have been amazed at how strong and rigid it feels, I was keen to get a weight on it, but there is no scales available in the work shop and my wife has banned me from taking anything from the kitchen or house.
So far [...]

More »